Ìyàtọ̀ láàrin àwọn àtúnyẹ̀wò "Afárá Third Mainland"

575 bytes removed ,  07:23, 24 Oṣù Kẹrin 2010
Kò sí ìsọníṣókí àtúnṣe
(Created page with '{{Infobox_Bridge |bridge_name= Third Mainland Bridge |image= Third_Mainland_Bridge.jpg |caption= |official_name= |Also_known_as= |carries= Vehicular Traffic |crosses= [[Lagos ...')
 
No edit summary
}}
 
The '''Third Mainland Bridge''' isni theo longestgunjulo ofninu threeawon bridgesafara connectingmeta to sejapo [[Lagos Island|Erekusu Eko]], [[Lagos]], [[Nigeria]] to themo mainlandoluile, theawon othermeji twoto ku beingni theafara [[Eko Bridge|Eko]] andati [[Carter Bridge|Carter]] bridges. ItOhun isni theafara longestto bridgegunjulo inni [[Africa]].
TheAfara bridgeThird startsMainland frombere lati [[Oworonshoki]] whichto isjamo linked to theojuona [[Apapa]]-Oshodi expressati way andojuona Lagos-[[Ibadan]], expresso way,si anddopin endsni at theiyana Adeniji Adele Interchange onni Lagos Island. There is also a link midway through the bridge that leads to the [[Herbert Macaulay Way]], Yaba.Ile-ise The Bridge was built by [[Julius Berger Nigeria PLC]] andlo openedko byni 1990 labe ijoba ologun PresidentAare [[Ibrahim Babangida]]. inIgun 1990:re it measures aboutje 11.8km in length.
 
However, there are recent reports that the Third Mainland Bridge is now vibrating, indicating that it needs urgent attention<ref>[http://www.sunnewsonline.com/webpages/opinion/editorial/2006/sept/13/editorial-13-09-2006-001.htm Anxiety over Third Mainland Bridge]</ref>.
 
Remedial work has commenced on the failed portions of the bridge.<ref>[http://odili.net/news/source/2008/jul/16/416.html Third Mainland bridge shut for two months]</ref>