STS-128
Àmìyẹ́sí ìránlọṣe
Statistiki ìránlọṣe
Orúkọ ìránlọṣeSTS-128
Space shuttleDiscovery
Spacecraft massOrbiter/payload liftoff mass: 267,689 pounds (121,422 kg)[1]
Launch pad39A
Launch date28 August 2009
23:59 EDT/
03:59 UTC August 29[2]
  • Launch window: 9 minutes 45 seconds
  • Shuttle liftoff mass: 4,522,852 pounds (2,051,531 kg)[1]
Landing11 September 2009
20:53 EDT (00:53 UTC)
Runway 22
Edwards Air Force Base, California
Mission duration13 days 20:54:55
Number of orbits219
Orbital period94 min
Orbital altitudeInsertion: 122 nautical miles (226 km); Orbital: 188 nautical miles (348 km)
Orbital inclination51.6 degrees
Distance traveled5,755,275 miles (9,262,217 km)
Crew photo
Seated (l–r) Ford and Sturckow. Standing (l–r) are Hernández, Olivas, Stott, Fuglesang and Forrester.
Ìránlọṣe bíbátan
Ìránlọṣe kíkọjásẹ́yìn Ìránlọṣe kíkànníwájú
STS-127 STS-129


  1. 1.0 1.1 NASA: STS-128 Press Kit
  2. Ryba, Jeanne (August 25, 2009). "Latest Shutle News – Launch Team Targets Aug. 28 Launch". NASA.gov. Archived from the original on February 10, 2011. Retrieved August 26, 2009.